So from the end of the day the 23rd this is where
we were at;
all the shingling
that could be done
was
done; the soffits and peaks were complete;
the garage doors were framed
and we were waiting for the windows (which were supposed to have been delivered
on the 21st) to arrive at, or from, TNT. And we still haven't solved the
problem of the access door to the upstairs storage.