For a day the slab rested.
But Friday morning by about 7:15 Garth was there with a load of pink foam
insulation, and a few minutes later had taken off the forms and was laying
the insulation
, when Nick
arrived with the hoe.
Down the drive
it came,
and it wasn't long before
it was
spreading a load of fill
around the
foundation.
Pretty soon
it started
to take
shape, and the
hoe came
around to the
other side. Just before noon a truck arrived to take away the forms and
stakes
while a ditch
formed for the drainage
and anoter
for the electrical
conduit.Then it was about grooming
and spreading,
and by
three o'clock this
was
what
was
left.
But then, suddenly . . .